S05443 Summary:
| BILL NO | S05443 |
|   | |
| SAME AS | SAME AS A08952 |
|   | |
| SPONSOR | WRIGHT |
|   | |
| COSPNSR | ONORATO |
|   | |
| MLTSPNSR | |
|   | |
| Amd S165, Pub Serv L | |
|   | |
| Requires proceeding on an application for the modification of an existing major electric generating facility, or siting a new major electric generating facility near an existing facility to be completed in all respects within 6 months, when such modification or siting shall result in at least a 75% reduction in the rate of emissions, on a pounds per megawatt-hour basis, of oxides of nitrogen, oxides of sulfur and particulate matter; authorizes and extension of such deadline by 3 months under certain circumstances. | |